Liebherr HCS 20 Cabinet Opening Dimensions - Figure, Planning Information

Models: HCS 20

1 14
Download 14 pages 6.19 Kb
Page 5
Image 5
Cabinet Opening Dimensions - Figure 4

PLANNING INFORMATION

Cabinet Opening Dimensions - Figure 4

IMPORTANT

Do not install the shut-off valve

behind the appliance.

Electrical outlet

Water line opening

A.36" (914 mm)

B.24-3/4" (629 mm)

C.80" (2032 mm)

Water supply line

Figure 4

IMPORTANT

At 24" cabinets, the water line opening must be in the

location as shown in Figure 4.

At cabinets deeper than 24" there is room to fit the pipe behind the appliance and the wall so there are no requirements for the water line lead out position.

IMPORTANT

The free length of the water supply line must be at least 31 - 1/2" (800 mm) when the tube comes out of the prescribed opening.

5

Page 5
Image 5
Liebherr HCS 20 Cabinet Opening Dimensions - Figure, Planning Information, A. 36 914 mm B. 24-3/4 629 mm C. 80 2032 mm