426

 

 

11

 

 

 

 

 

 

 

FIGURE 17

1

 

STEP 17:

Screw the threaded end of the 112-3/4” LOW ROW CABLE (11) into threaded housing on the base of BENCH FRAME (1) and tighten jam nut securely.

Slide the SHROUD (42) between the TOWER (6) as shown in FIGURE 17.

SECURELY tighten the bolts of the PULLEY BLOCK ASSEMBLY.

1/2

1/2

1/2

1/2

1/2

1/2

0

1

2

3

4

5

 

 

 

 

 

14

6

Page 14
Image 14
Life Fitness 8210 manual 426