SM30 Unpacking & Assembly Instructions
13
Figure 15. Adjustable crossover cable end detail.
Using a 7/8” wrench, tighten the jam nut onto the adjustable pulley threads as shown in Figure
15. Place a rubber cap on the top of the cable as shown in Figure 15 (right).
LAT PULLDOWN CABLE ROUTING
Route the lat pulldown cable as shown in Figure 16. Screw the cable into the weight stack as
shown in Figure 17.
Figure 16. Lat pulldown cable routing.