SM30 Unpacking & Assembly Instructions
6
3. Mount the tops. Mount the 56” lat top to the cell by inserting two of the large 7/16” by 6”
bolts using the hardware configuration shown in Figure 5. Use a 5/8” socket with
extension and combination wrench. Mount the 29” tricep top and adjustable crossover top
to the frame and connecting beam. You will need to remove the pulleys from the teardrop
pulley assemblies to gain clearance for the socket wrench extension. Leave the pulleys
out of the housings until the cables have been installed.
3/8” x 3” (2)
7/16” x 6” (4)
TUV

Remove pulleys from

housings to give clearance

to socket extension

Figure 5. Mount lat top (V), tricep top (U), adjustable crossover top (V).
150 pound
weight stack
300 pound
weight stack
150 pound
weight stack
Figure 6. Mount rubber bumpers and the weight stacks.