Lincoln 1921, 1922 service manual Dual Technology Finisher, Sequence Of Operation

Models: 1922 1921

1 24
Download 24 pages 61.12 Kb
Page 2
Image 2

SEQUENCE OF OPERATION

DUAL TECHNOLOGY FINISHER

1921

208VAC

60 HZ.

3 PHASE

1922

240VAC

60 HZ.

3 PHASE

 

 

 

POWER SUPPLY

 

Electrical power to be supplied to the oven by a four conductor service for three phase.

 

 

Black conductor is hot.

 

 

 

 

Red conductor is hot.

 

 

 

 

Orange conductor is hot

 

 

 

 

Green conductor is ground.

 

MAIN FAN CIRCUIT

 

Power is permanently supplied through the 10 amp fuses, through the normally closed

 

 

oven cavity hi-limit thermostat, to the normally open main power switch and to terminal

 

 

number 1 of the 30 minute cool down timer. Closing the main power switch enables the

 

 

30 minute cool down timer. The 30 minute cool down timer supplies line voltage to the

 

 

coil of the main fan relay, its contacts now close, supplying 208/240VAC to the main fan

 

 

motor. Voltage is also supplied to the primary of the control transformer, the conveyor

 

 

motor, the oven control and the infrared heater switch.

 

 

NOTE: Model 1922 ovens use a 240VAC to 208VAC step down transformer for the

 

 

main fan motor

 

 

TEMPERATURE CONTROL

 

Closing the main power switch supplies 208/240VAC to the primary of the control

 

 

transformer. Secondary voltage, 24VAC, is supplied to the oven control. The oven

 

 

control is set to desired temperature. The thermocouple will provide varying millivolts to

 

 

the oven control. The oven control supplies 208/240VAC to the coil of the heater relay at

 

 

intermittent intervals to maintain the desired temperature. The display on the oven

 

 

control will indicate when the main heater relay is energized.

 

 

NOTE: The display also indicates oven temperature.

INFRARED HEAT

 

Closing the infrared heater switch supplies line voltage to the coil of the infrared heater

 

 

relay, its contacts now close, supplying 208/240VAC to the infrared heaters.

CONVEYOR DRIVE

 

Closing the main power switch supplies 208/240VAC to the primary of the control

 

 

transformer and, through the air pressure switch, the Infrared heater switch, to the

 

 

conveyor motor. Secondary voltage, 24VAC, is supplied to the oven control. Setting the

 

 

oven control to the desired time outputs voltage, through a reversing switch and

 

 

capacitor, to the conveyor motor.

 

 

 

NOTE: The conveyor system uses a hall effect sensor and magnet to prove operation of

 

 

the conveyor motor. If the conveyor motor is not running, “BELT JAM” is indicated on

 

 

the display.

 

 

AUTOMATIC COOL DOWN

 

When the machine is started, the time delay relay timing circuit is enabled, permitting

 

 

the main fan to operate for approximately 30 minutes after the machine is shut off, to

 

 

cool the machine. The 30-minute time delay relay will keep the coil of the main fan relay

 

 

energized, maintaining operation of the main fan motor for 30 minutes.

2

DTF – 1920 Series Service Manual

Page 2
Image 2
Lincoln 1921, 1922 service manual Dual Technology Finisher, Sequence Of Operation