Lincoln Electric IM311-E manual Instructions for Loading Wire Into LN-23P

Models: IM311-E

1 35
Download 35 pages 5.31 Kb
Page 12
Image 12

B-2

OPERATION

B-2

 

 

 

INSTRUCTIONS FOR LOADING WIRE INTO LN™-23P

(For machines that have code numbers Higher than 11384.)

1.With the power shut off and input leads going to the wire feeder disconnected, lay LN™-23P down with wire reel facing up.

2.Remove compartment cover along with plastic wire reel brake and reel cover. Pull wire end from spool and route it through the liner opening that is mount- ed inside the wire reel case.

 

 

Feed Wire thru

Reel Cover

 

Liner Opening.

 

 

 

3.Pull 2-3 ft. of wire through upper conduit cable piece as shown in picture below.

4.Add Reel Cover. Form a loop with the wire and route it through the lower conduit piece and past the drive rolls as shown below .

Feed into Drive

Rolls in this area.

Loop

Enter Wire thru conduit piece

Add Reel Cover

WARNING

ELECTRIC SHOCK can kill.

Do not touch electrically hot parts.

5.Turn on power and trigger the gun to take up slack in the wire.

Watch for kinks when feeding wire thru conduit.

6.Connect the upper conduit and lower Conduit pieces as shown in picture below.

2-3 Feet

Upper and Lower conduit.

LN™-23P

Page 12
Image 12
Lincoln Electric IM311-E manual Instructions for Loading Wire Into LN-23P, For machines that have code numbers Higher than