B-3

OPERATION

B-3

 

 

 

WELDING OPERATIONS

SEQUENCE OF OPERATION

Wire Loading

Refer to Figures B.2 and B.3.

The machine power switch should be turned to the OFF (“O”) position before working inside the wire feed enclosure.

The welder is shipped from the factory ready to feed 8" (200 mm) diameter spools with 2.2" (56 mm) maxi- mum width. These spools fit on a 2" (51 mm) diameter spindle that has a built in, adjustable friction brake to prevent overrun of the spool and excess slack in the wire.

Note:When loading and removing the 8” Spools make sure that the wing nut (inside the wire spool spindle hub) is turned 90° from the wire spool spindle locking tab. If the wing nut is positioned in line with the locking tab, the tab cannot be depressed to load or unload the wire spool.

FIGURE B.2

Wire Spool Spindle

8” Wire Spool

Be sure that this stud engages the hole in the wire spool.

To Wire Drive

Wire Spool must be pushed all the way on the spindle so that the spindle’s tab will hold it in place. The Wire Spool will rotate clock- wise when wire is dereeled.

Load an 8” (200 mm) diameter spool on the wire spool spindle shown in Figure B.2.

To use 4” (100 mm) diameter spools, the 2” (50 mm) diameter spindle must be removed (See Figure B.3). Remove the wing nut and spacer at the end of the shaft and remove the outside plastic wire spool spin- dle. The spindle can be stored in the wire feed com- partment. A 4” (100 mm) diameter spool is mounted directly on the 5/8” (16 mm) diameter shaft and held in place with the previously removed hardware. Also make certain the start end of the wire, which may pro- trude through the side of the spool does not contact any metallic case parts.

FIGURE B.3

 

 

4" Wire Spool

Wire Spindle Shaft

 

 

 

 

 

Wing Nut

and Spacer

To Wire Drive

SP-100T

Page 16
Image 16
Lincoln Electric SP-100T manual Welding Operations, Sequence of Operation, Wire Loading