![](/images/new-backgrounds/1054615/5461563x1.webp)
Outdoor Knight XL Installation & Operation Manual
6 Condensate disposal
Condensate drain
1.This boiler is a high efficiency appliance that produces condensate.
2.The side of the boiler has a 1/2 inch (12.7 mm) PVC union for connection of a 1/2 inch (12.7 mm) PVC pipe (FIG.
3.Slope condensate tubing down and away from the boiler into a drain or condensate neutralizing filter. Condensate from the Outdoor Knight XL will be slightly acidic (typically with a pH from 3 to 5). Install a neutralizing filter if required by local codes.
A Neutralizer Kit (FIG.
4.Install the 1/2 inch (12.7 mm) PVC tee assembly (shipped with the unit) as shown in FIG.
5.Leave the top of the 1/2 inch (12.7 mm) tee OPEN. This is needed as a vacuum break.
6.Do not expose condensate line to freezing temperatures. Precautions should be taken to protect the condensate management and disposal system during extended periods of outdoor temperatures below 32°F.
7.Use only plastic tubing or piping as a condensate drain line (FIG.
NOTICE | Use materials approved by the authority | |
having jurisdiction. In the absence of other | ||
| ||
| authority, PVC and CPVC pipe must comply | |
| with ASTM D1785 or D2845. Cement and | |
| primer must comply with ASME D2564 or | |
| F493. | |
| To allow for proper drainage on large | |
NOTICE | ||
horizontal runs, a second line vent may | ||
| be required and tubing size may need to | |
| increase to 1 inch (25 mm). |
The condensate line must remain unbstructed, allowing free flow of condensate. If condensate is allowed to freeze in the line or if the line is obstructed in any other manner, condensate can exit from the boiler tee, resulting in potential water damage to property.
8.A condensate removal pump is required if the boiler is below the drain. When installing a condensate pump, select one approved for use with condensing boilers and furnaces. The pump should have an overflow switch to prevent property damage from condensate spillage. The switch should be wired in series with the blocked drain switch inside the boiler (see FIG.
Figure 6-1 Condensate Disposal
|
| 1/2" PVC TEE ASSEMBLY |
|
| (FACTORY SUPPLIED) |
|
| IMG00331 |
| FLOOR DRAIN OR | 1/2" PVC UNION |
| DRAIN PAN | |
| (FACTORY SUPPLIED) | |
|
| |
32 |
| NEUTRALIZER KIT |
| KIT3087 shown for illustration purposes. |