Louisville Tin and Stove W255F, W506F, W505F, W256F warranty Figurea, Figure C

Models: W506F W505F W255F W256F

1 25
Download 25 pages 48.25 Kb
Page 7
Image 7
FIGUREA

WARNING: Do not bypass the blocked flue switch. To do so could expose the consumer to property damage, personal injury or possible death.

 

 

More than 10’

Height above any

FIGUREA

roof surface

10’

within 10’

 

 

 

horizontally

 

Ridge

2’ Min.

3’ Min.

 

 

 

 

10’ or Less

Chimney

 

 

 

 

Ridge

2’ Min.

 

 

3’ Min.

 

 

ROUGH-IN INSTRUCTIONS NOTE: Maximum wall thickness for a dual wall (W505, W506) installation is 5-3/8”.

STEP 1. Attach the base plate (purchased with the vent pipe) to the header plate using two No. 8 sheet-metal screws through the pre-punched holes. The heater may not vent properly without a base plate to anchor and seal the vent system. See Figure C.

 

Chimney

 

 

 

 

 

 

 

 

Man. Reset

 

 

Blocked

 

 

Flue Switch

 

 

Draft

Reset

 

Button

 

Diverter

Switch/

 

Relief

 

Gas

Opening

 

Control

Combus-

 

Wire

 

Installation of B-W Gas Vent for one story buildings or for first floor of multi- story buildings

Ceiling plate spacers to center B-W gas vent in stud space - nail securely at both ends

Plate cut away for full width of stud space to provide ventilation

Studs on 16 inch centers

Sheet metal screw base plate to header

Use manufacturer’s method of fastening pipe to base plate

 

tion

 

Chamber

 

 

FIGUREB

FIGUREB-1

To heater gas control valve

Manual cut-off-valve

1/8” NPT

Gas

Supply

Pressure Tap

Line

 

Drip

 

Leg

 

 

 

GAS SUPPLY

 

Header plate of vented wall furnace (also acts as firestop)

FIGURE C

STEP 2. Cut out an opening between the studs of 14-3/8” x 66-1/2” above the floor plate. Embed the rear flange of the channel on top of header into either the drywall or the plastered wall. This provides part of the required fire stop. Square up and nail the header in place with the top front of header located 65-3/4” above floor plate. (See arrow on right side of header and Figure 1, 5A and 5B on Page 7).

STEP 3. Rough in ½” gas supply on center line of left stud either 4” above top of floor plate or 4” to right of left stud through floor plate. See Figure 1 located on Page 7.

Page 7

Page 7
Image 7
Louisville Tin and Stove W255F, W506F, W505F, W256F warranty Figurea, Figure C