P 4/ 8
Repair
[3]-2 Spiral Bevel Gear 26
DISASSEMBLING
(1)Remove Keyless drill chuck as illustrated in Figs. 2 and 3 / Figs. 2A and 3A. And disassemble Bearing retainer as illustrated in Figs. 4 and 5.
(2)Disassemble Spiral bevel gear 26 in the order of Figs. 6to 10.
Fig. 4
To fit 1R292 to the notch of Bearing | notch for fitting | |
retainer, enlarge this width from 30mm | ||
1R292 | ||
to 36mm by grinding 1R292. |
| |
1R292 |
|
Bearing retainer
Fig. 5
Remove Bearing retainer
1R292
Clamp the machine with vise.
Bearing retainer
Fig. 6
Remove Gear section by striking the edge of Gear housing.
Spindle
Bearing box
Spiral bevel gear 26
Fig. 9
Fig. 7
Remove Bearing box from Spindle.
Bearing box can be removed by hand.
Bearing box
Ball bearing
6001DDWSpindle
Ball bearing | Spiral bevel |
608ZZ | gear 26 |
|
|
| Fig. 10 |
Fig. 8
Remove Ball bearing 608ZZ | |
with 1R269. |
|
| 1R269 |
Retaining |
|
ring | Ball bearing 608ZZ |
1R291
Key 4
Retaining ring
Remove Retaining ring
Key 4
Spiral bevel gear 26
Spiral bevel gear 26 can be removed by hand. Then remove Key 4.
ASSEMBLING
Do the reverse of the disassembling steps.
Note: Do not forget to assemble Key 4 to Spindle. Refer to Fig. 10.