Makita EM2650UH/Em2650LH manual Operating time Before, Daily 30h 50h 200h, Operation, 10h Rest

Models: EM2650UH/Em2650LH

1 84
Download 84 pages 13.68 Kb
Page 23
Image 23

Operating time

Before

After

Daily

30h

50h

200h

Shutdown/

Corres-

Item

operation

lubrication

(10h)

rest

ponding P

 

 

 

Engine oil

Inspect/clean

 

 

 

 

 

 

13

Replace

 

 

 

*1

 

 

19

 

 

 

 

 

 

Tightening parts

Inspect

 

 

 

 

 

 

21

(bolt, nut)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fuel tank

Clean/inspect

 

 

 

 

 

 

Drain fuel

 

 

 

 

 

*3

22

 

 

 

 

 

 

Throttle lever

Check function

 

 

 

 

 

 

Stop switch

Check function

 

 

 

 

 

 

17

Cutting blade

Inspect

 

 

 

 

 

 

11

Low-speed rotation

Inspect/adjust

 

 

 

 

 

 

17

Air cleaner

Clean

 

 

 

 

 

 

20

Ignition plug

Inspect

 

 

 

 

 

 

21

Cooling air duct

Clean/inspect

 

 

 

 

 

 

21

Fuel pipe

Inspect

 

 

 

 

 

 

21

Replace

 

 

 

 

*2

 

 

 

 

 

 

 

Gear-case grease

Refill

 

 

 

 

 

 

21

Fuel filter

Clean/replace

 

 

 

 

 

 

21

Clearance between air intake

Adjust

 

 

 

 

*2

 

valve and air discharge valve

 

 

 

 

 

 

 

 

Engine overhaul

 

 

 

 

 

*2

 

Carburetor

Drain fuel

 

 

 

 

 

*3

22

*1 Perform initial replacement after 20h operation.

*2 For the 200 operating hour inspection, request Authorized Service Agent or a machine shop. *3 After emptying the fuel tank, continue to run the engine and drain fuel in the carburetor.

23

Page 23
Image 23
Makita EM2650UH/Em2650LH manual Operating time Before, Daily 30h 50h 200h, Operation, 10h Rest