| I 8 hours 120 hours I | 1 | 4500hours I1OOOhours | |
| (daily) (weekly) | hours 2oo hou | a2monlhs) Q4months' | |
CLEAN ENGINE AND CHECK BOLTS AND | 0(daily) |
|
|
|
NUTS |
|
|
| |
CHECK AND REFILL ENGINE OIL | 0(Refill daily to full mark) |
|
| |
CHANGE ENGINE OIL (* NOTE 1 , 2 ) | 0(Initial |
|
|
|
20 hours) |
|
|
| |
| 0 |
|
| |
CLEAN SPARK PLUG |
|
|
| |
WASH AIR CLEANER ELEMENTS |
| 0 |
|
|
(* NOTE 2 ) |
|
|
| |
CLEAN AND ADJUST SPARK PLUG CAP |
|
| 0 |
|
CLEAN FUEL STRAINER | I | I | I | I | I |
REPLACE SPARK PLUG | I | I | I | l o 1 | |
REPLACE CLEANER ELEMENT |
|
|
|
| 0 |
(* NOTE3) |
|
|
|
| |
CLEAN VALVE SEAT ALONG WITH |
|
|
| 0 | |
CYLINDER HEAD (* NOTE 3) |
|
|
|
| |
REMOVE CARBON FROM | CYLINDER |
|
|
| 0 |
HEAD (* NOTE 3) |
|
|
|
| |
ADJUST VALVE CLEARANCE (* NOTE 3) |
|
|
| 0 | |
CLEAN AND ADJUST CARBURETOR |
|
|
| 0 | |
(* NOTE 3) |
|
|
|
| |
CHANGE FUEL LINES |
|
|
|
| 0 |
INSPECT CONTROL PANEL PARTS |
|
|
|
| |
(* NOTE 3) |
|
|
|
|
|
CHECK ROTOR AND STATOR (* NOTE 3)
REPLACE ENGINE MOUNT RUBBER (*NOTE 3)
OVERHAUL ENGINE (* NOTE 3)
NOTE :
0
0
0
0
1.Initial oil change should be performed after first twenty (20) hours of operation. Thereafter change oil every fifty (50) hours. Before changing oil, check for a suitable way to dispose of old oil. Do not pour it down into sewage drains, onto garden soil or into open streams. Your local zoning or environmental regu- lations will give you more detailed instructions on proper disposal.
2.Change more often if used in dusty or dirty environments.
3.As to the procedures for these items, please consult your nearest Makita factory or authorized service center.
- 22 -