
P 7/ 14
Repair
[3] DISASSEMBLY/ASSEMBLY
[3] -3. Spiral bevel gear [large one], Ball bearings 696ZZ/ 6201DDW
DISASSEMBLING
Note: The gear and the ball bearings can be replaced without disassembling the motor section.
(1)Remove Ball bearing 696ZZ, Retaining ring
Fig. 7
1.Remove four M4x16 Hex socket head bolts, then separate Bearing box section from Gear housing.
M4x16 Hex socket head bolt
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Bearing box ![]()
![]()
![]()
section
2.Remove Ball bearing 696ZZ with 1R269.
1R269
Ball bearing
696ZZ ![]()
![]()
3. Remove Retaining ring | 4. Remove Flat washer 10. |
with 1R291. | Then, remove |
1R291 |
|
| |
Retaining | Flat washer 10 |
| |
ring |
|
5. Receive Bearing box with 1R258 |
| 6. Joint sleeve can be removed. |
and remove Spindle by pressing it |
|
|
with Arbor press. |
|
|
|
| Joint sleeve |
Arbor press |
|
|
7.Using 1R291, remove Retaining ring
Then, separate Lead flange from Spindle .
1R258
1R258
1R258
|
| Retaining |
|
| ring |
1R258 |
| Spindle |
| Spindle | Lead flange |
|
|