P 7/ 14
Repair
[3] DISASSEMBLY/ASSEMBLY
[3] -3. Spiral bevel gear [large one], Ball bearings 696ZZ/ 6201DDW
DISASSEMBLING
Note: The gear and the ball bearings can be replaced without disassembling the motor section.
(1)Remove Ball bearing 696ZZ, Retaining ring
Fig. 7
1.Remove four M4x16 Hex socket head bolts, then separate Bearing box section from Gear housing.
M4x16 Hex socket head bolt
Bearing box section
2.Remove Ball bearing 696ZZ with 1R269.
1R269
Ball bearing 696ZZ
3. Remove Retaining ring | 4. Remove Flat washer 10. |
with 1R291. | Then, remove |
1R291 |
|
| |
Retaining | Flat washer 10 |
| |
ring |
|
5. Receive Bearing box with 1R258 |
| 6. Joint sleeve can be removed. |
and remove Spindle by pressing it |
|
|
with Arbor press. |
|
|
|
| Joint sleeve |
Arbor press |
|
|
7.Using 1R291, remove Retaining ring
Then, separate Lead flange from Spindle .
1R258
1R258
1R258
|
| Retaining |
|
| ring |
1R258 |
| Spindle |
| Spindle | Lead flange |
|
|