P 14/17
Wiring diagram
[2] Wiring in Handle Base and Handle
High Voltage Areas where Radio Interference Suppression Is Required
Fig. D-4A
Handle base,
viewed from Controller side
Controller
Route all of the Controller's
Lead wires through this slit.
Fix the following Lead wires of Controller with this Lead wire holder: *Lead wire (orange) to Choke coil *Lead wires (black, red) to Connector
housing A
Lead wires covered with Polyolefin tube (black)
red
blue
Pass these Lead wires from Controller and Connector housing A through the hole illustrated to right in Fig.
Choke coil | Connector housing A |
Connector housing B
Controller
The Lead wires to Connector housings must be tight between Controller and Lead wire holder.
Fig. D-5A
Fix all of the Lead wires to Switch with this Lead wire holder of Switch holder complete.
Handle, viewed from Handle cover side
Switch holder
Switch
Route all of the Lead wires to Switch through between the boss and the rib.
Pass the following Lead wires through this hole:
*Noise suppressor's Lead wires (black)
*Controller’s Lead wires covered with Polyolefin tube (black)
*Lead wire (red) from Connector housing A
*Controller's Lead wire (white)
Put the slack portion of
Lead wires in this space.
Pass Controller’s Lead wires covered with Polyolefin tube (black) between Switch and Switch holder's wall.
rib |
|
boss | Handle base, |
| |
| viewed from Handle side |
Noise suppressor |