P 11/ 12
Wiring diagram
Fig. D-5
UR140D, UR180D
Wiring to Terminal
While facing the wire connecting portions to Pipe 25 side, connect the Lead wires (black, Yellow) to Terminal. And then, connect Lead wire (red) to Terminal.
Lead wire (Yellow)
| Wire connecting | Lead wire | |
Lead wire | portion | ||
(red) | |||
(black) |
|
|
Pipe 25 side
Terminal
Handle (L) side
Fig. D-6
Wiring in Handle (L)
LED warning lamp | Put LED warning lamp’s lead wire (red)* on | |
its lead wire (black) and insert them into | ||
| ||
| the groove in Handle (L). | |
| *using Lead wire (white) for some countries | |
| Rib | |
| Power supply cord unit |
Pass Lead wire (red) between Terminal and Switch through the space between Rib A and Rib B.
Rib | at least |
| |
| 5 mm |
Rib A
Switch
Lead wire (red)
Terminal
Rib B
Sheath
1.Come out at least 5 mm long portion of Power supply cord unit from the lower edge of Labyrinth figured lead holders.
But the sheath end must not go over Rib A.
2.Make sure that Power supply cord unit is fixed in Labyrinth figured lead holders.