OPERATING INSTRUCTIONS

MODELS:

M24G100A - 4SP

M24G200A - 4SP

M36G100A - 4SP

M36G200A - 4SP

M36G300A - 4SP

Control Panel

OPERATING INSTRUCTIONS

STEAM GENERATORS

FIRST CHECK TO BE SURE THAT:

A. WATER SWITCH IS IN THE OFF POSITION. B. WATER SUPPLY VALVE IS OPEN.

C. ELECTRICITY IS CONNECTED TO ALL UNITS.

D. THAT THE GAS IS TURNED ON. (GAS OPERATED UNITS ONLY) E. THEN PROCEED WITH DAILY OPERATING PROCEDURES.

DAILY OPERATING PROCEDURE

STEP 1 PRESS WATER SWITCH FROM OFF TO ON.

STEP 2 WAIT 5-10 MINUTES FOR WATER TO FILL IN STEAM GENERATOR (GAUGE GLASS SHOULD BE 2/3 FULL.)

STEP 3 PRESS HEAT SWITCH FROM ON TO OFF AND RELEASE BACK TO ON WHEN THE LOW WATER LIGHT GOES OFF. GREEN INDICATOR LIGHT WILL COME ON. (THIS IS NECESSARY TO MANUALLY RESET THE UNIT.)

DAILY SHUT DOWN AND CLEANING

STEP 1 PRESS WATER SWITCH OFF. THIS WILL DRAIN THE STEAM GENERATOR.

STEP 2 AFTER STEAM GENERATOR HAS COMPLETELY DRAINED REPEAT STEAPS 1 & 2 OF DAILY OPERATING PROCEDURE.

(WATER TO REMAIN IN STEAM GENERATOR UNTIL NEXT DAILY USE.)

5

Page 8
Image 8
Market Forge Industries M24G200A-4SP, M36G300A-4SP, M24G100A-4SP manual Operating Instructions, First Check to be Sure That