MartinLogan 33ISDG CLEARANCES and HEIGHT REQUIREMENTS, 21/2, 26 10, Do not cover louvers, Hood

Models: 33ISDG

1 40
Download 40 pages 62.92 Kb
Page 12
Image 12
CLEARANCES and HEIGHT REQUIREMENTS

CLEARANCES and HEIGHT REQUIREMENTS

No combustible materials

within 8” of opening.

Do not cover louvers.

HEAT RESISTANT MATERIAL (MINIMUM REQUIRE- MENTS) WITH NO WOODEN MANTEL OR OTHER COM- BUSTIBLE PROJECTION

Heat resistant material (minimum requirements) with wooden mantel or other combustible projection:

To install the heater with a wooden mantel shelf or other combustible projection above, first measure the heat resistant material shown in Figure 7.

Hood

12"

10"

8"

6"

21/2"

12"21/2" 26" 14"

10"

8"

Example: A mantel may project from the wall a maximum of 21/2" at minimum of 8" above the opening, and a maximum of 12" at a minimum of 26" above the opening.

Figure 7 - Measuring Heat Resistant

Figure 8 - Minimum Mantel Clearance

Material for Mantel

21/2"

8"

 26" 14" 6" No combustible materials within 8" of opening.Do not cover louvers.

Figure 9 is an example of an unsafe mantel installation. The mantel projects 4" at 8" above the opening, exceeding the maxi- mum acceptable distance of 21/2". The mantel also projects 8" at 10" above the opening, exceeding the maximum acceptable distance of 6".

No combustible materials within 8" of opening.

4"

If your mantel profile is unsafe, you may either:

• Raise the mantel to an acceptable height or,

• Remove the mantel.

Do not cover louvers.
8"

8" Hood

Figure 9 - Unsafe Mantel Clearance

12

23D8036

Page 12
Image 12
MartinLogan 33ISDG CLEARANCES and HEIGHT REQUIREMENTS, 21/2, 26 10, No combustible materials within 8 of opening, Hood