4.Provisions for adequate air supply must be provided as noted in this manual (refer to Fresh Air Supply Requirements in Section D).

5.Clearance provisions must be made from combustible construction as noted in this manual (refer to Dryer Enclosure Requirements in Section C).

6.Provisions must be made for adequate clearances for servicing and for operation as noted in this manual (refer to Dryer Enclosure Requirements in Section C).

7.The dryer must be installed with a proper exhaust duct connection to the outside as noted in this manual (refer to Exhaust Requirements in Section E).

8.Dryer must be located in an area where correct exhaust venting can be achieved as noted in this manual (refer to Exhaust Requirements in Section E).

IMPORTANT: Dryer should be located where a minimum amount of exhaust duct will be necessary.

9. The dryer must be installed with adequate clearance for air openings into the combustion chamber.

CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint buildup.

IMPORTANT: Dryer must be installed in a location/environment, which the ambient temperature remains between 40° F (4.44° C) and 130° F (54.44° C).

C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of 12-inches (30.48 cm) above the dryer’s outer top; except along the front of the dryer, which may be closed if desired.

NOTE: Allowances must be made for opening the control door.

NOTE: With the exception of the floor, clearances shown are for combustible construction.

X= 12-inch (30.48 cm) minimum, 24-inches (60.96 cm) is suggested for ease of maintenance. * Not applicable.

** A minimum of 12-inches (30.48 cm) above the dryer’s outer top; except along the front of the dryer, which may be closed if desired.

113307 - 7

Maytag Co.

7

Page 11
Image 11
Maytag MDG30MNV, MDG30PNH installation manual Dryer Enclosure Requirements