a.Single-Phase (1ø) Wiring Connections/Hookup

The electrical input connections on ALL single-phase (1ø) gas dryers are made into the rear service box located at the upper left area of the dryer.

Single-Phase Electrical Lead Connections

Black

+

Positive

White or Red

+

Neutral or L2

Green

+

Ground

FOR 110V APPLICATIONS

FOR 208-240V APPLICATIONS

A ground lug is provided in the rear electrical box to connect your service ground.

14

Maytag Co.

113307 - 7

Page 18
Image 18
Maytag MDG30PNH, MDG30MNV installation manual Single-Phase Electrical Lead Connections