Dryer Enclosure Requirements _______
AThe requirement to allow the dryer door to open completely is
BA minimum overhead clearance of
CDryer should be positioned a minimum of
D1/16” (1.5875 mm) minimum is required.
EFlooring should be level or below dryer cabinet for ease of removing panels during maintenance.
FDryers may be positioned sidewall to sidewall, however a 1/16” (1.5875 mm) minimum allowance must be made for the opening and closing of the control door, along with the removal of panels during maintenance.
G
Fresh Air Supply Requirements _______
When the dryer is operating, it draws in room air, heats it, passes this air through the tumbler, and exhausts it out of the building. Therefore, the room air must be continually replenished from the outdoors. If the
Air supply
It is not necessary to have a separate
A =
B =
EXAMPLE: For a bank of 4 dryers, 2 unrestricted openings measuring
To compensate for the use of registers or louvers used over the openings, this area must be increased by approximately 33%.
Allowances must be made for remote or constricting passageways or where dryers are located at high altitudes or predominantly low pressure areas.
IMPORTANT:
NOTE: Component failure due to dry cleaning solvent fumes will void the warranty.
Exhaust Requirements ________________
Exhaust ductwork should be designed and installed by a qualified professional. Improperly sized ductwork will create excessive back pressure, which results in slow drying, increased use of energy, and shutdown of the burner by the airflow (sail) switch, burner
▲! WARNING
Fire Hazard
Use a heavy metal vent. Do not use a plastic vent. Do not use a metal foil vent.
Failure to follow these instructions can result in death or fire.
113489 - 3 (W10185535) | Maytag Co. | 7 |