OPERATING PROCEDURE

PHOTOS

2. Removing the electronic control P.C. board, the

Photo 4

power monitor receiver P.C. board, SW P.C. board

 

and the terminal block

 

(1)

Remove the horizontal vane, the panel (Refer to 1.) and

 

 

the corner box.

 

(2)

Remove the screw of the conduit cover, and conduit cover.

 

 

(See Photo 2. or Photo 3.)

 

(3)

Remove the indoor/outdoor connecting wire.

Switch holder

 

 

(4)

Remove the switch holder from the electrical cover.

 

 

(See Photo 4.)

 

(5)

Remove the screw of the electrical cover, and then the

Screw of the

 

electrical cover. (See Photo 4.)

 

electrical cover.

 

 

(6)Remove the ground wire connected to the indoor electronic control P.C. board from the electrical box.

(See Photo 5.)

Power monitor

receiver

(7) Unhook the power monitor receiver P.C. board holder from

P.C. board holder

the catch. (See Photo 4.)

 

(8) Open the rear cover of the power monitor receiver P.C.

Photo 5

board holder and pull out the power monitor receiver P.C.

Ground wire

board.

(9) Open the switch holder and pull out SW P.C. board.

 

(10) Pull the electronic control P.C. board slightly toward you

Indoor fan motor

from the electrical box, and disconnect TAB3 and all the

connector (CN211)

connectors on the electronic control P.C. board.

Indoor coil thermistor

(LD101 and LD105 are direct-mounted to the electronic

connector (CN112)

control P.C. board.)

 

(11)Pull out the electronic control P.C. board from the electrical box.

(12) Remove the ground wire connected to the heat exchanger

Vane motor

from the electrical box. (See Photo 5.)

connector (CN151)

(13)Unhook the catches of the electrical box, and pull out the electrical box.

(14)Remove the screw of the terminal block cover, and then remove the terminal block cover and the terminal block holder. (See Photo 6)

(15)Remove the terminal block by sliding it.

Photo 6

3.Removing the electrical box

(1)Remove the horizontal vane, the panel (Refer to 1.) and the corner box.

(2)Remove the screw of Conduit cover, and then the indoor/ outdoor connecting wire. (See Photo 2. or Photo 3.)

(3)Remove the switch holder and the electrical cover. (See Photo 4.)

(4)Remove the ground wire connected to the heat exchanger from the electrical box. (See Photo 5.)

(5)Disconnect the following connectors on the electronic

control P.C. board; the fan motor connector <CN211>, the indoor coil thermistor connector <CN112>, the vane motor connector <CN151>. (See Photo 5.)

(6)Unhook the catches of the electrical box, and pull out the electrical box.

Screw

26

Page 26
Image 26
Mitsubishi Electronics MSY-A17NA, MSY-A24NA, MSY-A15NA Operating Procedure Photos, Photo Removing the electrical box