Mitsubishi Electronics TC-24A Setting the operation schedule, Schedule setting flowchart

Models: TC-24A

1 56
Download 56 pages 960 b
Page 29
Image 29

Main Menu > Time and Schedule > Set Schedules

2Setting the operation schedule

 

Types of schedules *

1

Number of operation patterns *2

 

 

Weekly

Use to assign an operation pattern for each day of the week to be

Maximum 12 patterns

executed every week.

 

 

 

 

 

 

 

One Day

Use to assign unique operation patterns for specific dates (up to seven

Maximum 5 patterns

days in advance, including the current date).

 

 

 

 

 

 

[Note] If a specific pattern is assigned to multiple groups or days and the configuration of the pattern is changed, the change will be reflected on all the groups and days.

Use a different pattern number to save a given configuration of events if you do not want the changes to be reflected on the groups and days to which the pattern is assigned.

Schedule setting flowchart

Set Schedule screens

Step 1 Select the Weekly or One Day tab.

Step 2 Select a group.

Step 3 Select days or dates.

Step 4 Assign a pattern to the selected days or dates.

Step 5 Configure the pattern.

Select Group and Days/Dates screen

Select Pattern screen

Edit Pattern screen

29

Page 29
Image 29
Mitsubishi Electronics TC-24A Setting the operation schedule, Schedule setting flowchart, Set Schedule screens