optional equipment
Forced Air Kit (FA2A)
If you are installing the forced air kit, Model FA2A, see the installation instructions provided with the kit for electri- cal wiring requirements, or the blower installation section. The firebox must be connected to main power supply at time of firebox installation. The blower must be installed prior to the installation of the
WARNING
Electrical connections should only be performed by a qualified, licensed electrician, main power must be off when connecting to main electrical power supply or performing service.
The blower when installed, must be electrically grounded in accordance with local codes or in the absence of local codes, with the National Electrical Code ANSI/NFPA 70.
14 | 61D1013 |