Appendix A:
Figure 9-18 Stress Relief Bar Screws
Strain Relief Bar Screws (2)
5. Spread out the three wires, so that the Blue wire is on the right side, the Brown wire is on the left
hand side, and the Green wire is in the center.
Figure 9-19 Power Cable Designations
Brown
Wire is
Line
GREEN
Wire is
Ground
Blue Wire
is Neutral
6. Loosen the Neutral, Line, and Earth Ground Screws.
Figure 9-20 Position of the Neutral, Line, and Earth Ground Screws
Line
Screw
Ground
Screw
(behind
plate)
Neutral
Screw
9-18