HPLA/HPHA-SERIES 36"TROWEL—TRAINING CHECKLIST

TRAINING CHECKLIST

This checklist will lists some of the minimum requirements for machine maintenance and operation. Please feel free to detach it and make copies. Use this checklist whenever a new operator is to be trained or it can be used as a review for more experienced operator’s.

TRAINING CHECKLIST

NO.

DESCRIPTION

OK?

DATE

 

 

 

 

1

Read Operator’s Manual completely.

 

 

 

 

 

 

2

Machine layout, location of components, checking of engine and

 

 

gearbox fluid level.

 

 

 

 

 

 

 

 

 

3

Fuel system, refueling procedure.

 

 

 

 

 

 

4

Operation of controls (machine not running).

 

 

 

 

 

 

5

Safety controls, safety stop switch operation.

 

 

 

 

 

 

6

Emergency stop procedures.

 

 

 

 

 

 

7

Startup of machine.

 

 

 

 

 

 

8

Maneuvering.

 

 

 

 

 

 

9

Pitching.

 

 

 

 

 

 

10

Concrete finishing techniques.

 

 

 

 

 

 

11

Shutdown of machine.

 

 

 

 

 

 

12

Lifting of machine.

 

 

 

 

 

 

13

Machine transport and storage.

 

 

 

 

 

 

Operator _________________________________________ Trainee __________________________________________

COMMENTS:

PAGE 6 — HPLA/HPHA-SERIES 36" WALK-BEHINDTROWEL— OPERATION AND PARTS MANUAL — REV.#3 (07/06/10)

Page 6
Image 6
Multiquip 21362 manual HPLA/HPHA-SERIES 36TROWEL-TRAINING Checklist, Read Operator’s Manual completely, Training Checklist