GA-6HZ— OPERATING INSTRUCTIONS

Before Starting

1.Be sure to disconnect the electrical load and switch the main circuit breaker to the “OFF” position prior to starting the engine.

2.Never start the engine with the main circuit breaker “ON”.

3.Check the lubricating oil level prior to starting the engine. Make sure the generator is level. The oil level must be maintained between two notches on the dipstick.

4.When there is not enough lubricating oil, fill the crankcase with high grade motor oil. Use a high quality detergent oil classified SC, SD or SE. (See Table 3 on page 13)

CAUTION:

zNEVER start the engine when the oil level is below the lower mark on the dipstick.

zCheck the fuel level on the fuel gauge. When fuel is low, fill the fuel tank with clean fresh unleaded automotive gasoline.

zIf gasoline spillage occurs, completely wipe up the spilled gasoline.

Starting

1.Open the fuel cock located below the fuel tank.The fuel starts to flow when the fuel cock lever is turned downward.

2.Place the idle control switch in the “ON” (up) position.

3.Close the choke. Adjust the opening of the choke valve according to operating conditions. When the engine is warm or the air temperature is high, close the choke valve halfway or open it all the way.

4.Confirm that the main circuit breaker on the generator control box is “OFF”.

5.Set the operation switch to the “ON” position and grasp the starting rope and slowly pull it out. The resistance becomes hardest at a certain position, corresponding to the compression point. Rewind the rope a little from that point and pull out sharply.

6.If the engine fails to start, repeat the procedure.

CAUTION:z DO NOT pull the starter rope all the way to the end.

zDO NOT release the starter rope after pulling. Allow it to rewind as soon as possible.

Warm up

1.When the engine starts, open the choke slowly.

2.Run the engine at low speed for 3 minutes without load until the engine warms up.

3.Turn the idle control switch to the "OFF" (down) position and check the voltage by referring to the voltmeter on the control box.

CAUTION:

DO NOT change the engine speed control lever which has been set at the factory prior to shipping.

1.Check the generator for abnormal noise and smells.Then connect the load to the receptacles of the generator.

2.Switch the main circuit breaker to the “ON” position and turn the idle control switch to the “ON” (down) position for normal (load) engine operation.

Operation

Check the voltage by referring to the voltmeter on the control box. When the voltmeter indicates 120 volts, 120 volts from the 120V receptacles and 240 volts from the 240V receptacle can be obtained at the same time. Refer to Figure 1, Controls and Indicators, item 6 on page 10.

Stopping the Engine

CAUTION:

NEVER stop the engine suddenly while running at high speeds.

1.Remove the load from the generator. Place the circuit breaker in the “OFF” position. Refer to Figure 1, item 1 on page 10. Run the engine (no-load) with the idle control switch set to the ON position for three to five minutes, then stop the engine.

2.Turn the START/STOP switch to the “STOP” position.

3.Close the fuel cock.

PAGE 16 — GA-6HZ A.C. GENERATOR — PARTS & OPERATION MANUAL — REV. #4 (10/08/04)

Page 16
Image 16
Multiquip operation manual GA-6HZ- Operating Instructions

GA-6HZ specifications

The Multiquip GA-6HZ is a robust and versatile generator designed for reliability and efficiency in various applications. Known for its powerful performance, the GA-6HZ is widely used in construction, events, and other high-demand environments where a consistent power supply is crucial.

One of the standout features of the GA-6HZ is its impressive engine, powered by a reliable Honda GX390. This air-cooled engine boasts a powerful output, providing ample power for a wide range of tools and equipment. The sturdy construction of the generator ensures it can withstand harsh job site conditions while delivering exceptional performance.

The GA-6HZ is equipped with a 6 kW maximum output, making it suitable for powering multiple devices simultaneously. The generator features both 120V and 240V outlets, allowing for versatile applications. The inclusion of a duplex outlet and a twist-lock outlet further enhances its usability, making it capable of meeting various power demands.

In terms of technology, the GA-6HZ employs a sophisticated alternator design that minimizes voltage fluctuations, ensuring stable power delivery even under varying loads. The generator also features an automatic voltage regulator (AVR) that enhances the efficiency and consistency of operation. This technology contributes significantly to the generator’s reliability, as it protects sensitive electronics from fluctuations that could cause damage.

Portability is another key characteristic of the GA-6HZ. It is designed with a compact footprint and features built-in lifting handles, making transportation to and around job sites convenient. Additionally, the generator is equipped with a large fuel tank that allows for extended run times, further minimizing downtime during crucial projects.

Another notable characteristic is its user-friendly control panel. The GA-6HZ features clearly labeled controls and gauges, allowing operators to monitor performance easily. The generator also has multiple safety features, including a low oil shutdown, ensuring that it operates smoothly without risking damage or safety hazards.

In summary, the Multiquip GA-6HZ stands out as a highly reliable and efficient generator, suitable for various demanding applications. With a powerful engine, versatile output options, advanced technology, and user-friendly features, it remains a popular choice among professionals seeking dependable power solutions.