Multiquip gbe/gbce manual setup

Models: gbe/gbce

1 44
Download 44 pages 45 Kb
Page 16
Image 16
setup

setup

1.Set the GBC/GBCE cart on a firm level surface where there is enough space around the cart for the outriggers to be deployed.

2.Insert the T-handle into the handle holder on the cart. Tighten with the wing bolt. See Figure 4.

T-HANDLE

HANDLE

HOLDER

WASHER WING

BOLT

Figure 4. T-Handle Installation

3.Insert the mast into the mast holder and secure with lever as shown in Figure 5.

MAST

HOLDER

LEVER

Figure 5. Inserting the Mast Into Holder

4.For the GBCE, attach the extension pole to the top of the mast as shown in Figure 6.

EXTENSION

POLE

BOLT

Figure 6. Extension Pole Attachment

5.Insert the balloon assembly into the mast. Tighten the T-bolt securely. See Figure 7.

BALLOON

PROTECTIVE

COVER

T-BOLT

MAST

Figure 7. Installing the Balloon

6.Unsnap the three buttons on the bottom of the balloon cover and unzip the cover. See Figure 8.

7.Remove the AC Power Cable from the inside pocket

of the balloon cover.

AC POWER

CABLE

ZIPPER

BUTTON

Figure 8. Removal of AC Power Cable from

Balloon Cover

8.Fold the balloon cover into itself and zip it up. See Figure 9.

FOLD PROTECTIVE

COVER INTO ITSELF

ZIPPER

BALLOON

FULLY

EXPOSED

Figure 9. Folding Balloon Cover

page 16 — GBC/GBCE lighting system • operation and parts manual — rev. #1 (03/25/14)

Page 16
Image 16
Multiquip gbe/gbce manual setup