Multiquip gbe/gbce manual Lowering The Mast, Shutdown, shutting down lamp only, Applying Power

Models: gbe/gbce

1 44
Download 44 pages 45 Kb
Page 20
Image 20
LOWERING THE MAST

operation

LOWERING THE MAST

1.Loosen the T-bolt holding the second mast and push mast all the way down. Tighten T-bolt securely. See Figure 21.

SECOND

MAST

T-BOLT

Figure 21. Lowering Second Mast

2.Push the lock/release tab on the third mast to release it and lower third mast. See Figure 22.

SHUTDOWN NOTICE

If the power cable is accidentally unplugged from the power source, wait three to five minutes before reconnecting the power. This will allow time for the fan to reset and ensure balloon will inflate properly when power is reconnected.

SHUTDOWN

1.Turn off the power switch of the generator.

2.Disconnect the AC power cable from the generator. The balloon should start to deflate and the lamp will turn off.

shutting down lamp only

1. Unzip the bottom of the balloon. See Figure 24.

LOCK/

THIRD RELEASE

MAST TAB

BALLOON

Figure 22. Lowering Third Mast

APPLYING POWER

1.Connect the AC power cable to the 120 VAC receptacle on the generator used. See Figure 23.

120VAC

RECEPTACLE

 

20A

TYPICAL

 

 

POWER

 

GENERATOR

 

FRONT PANEL

CABLE

 

 

 

 

120V

 

Figure 23. Connecting to Power Source

2.Start the generator as indicated in the generator manual. The balloon will start to inflate and the lamp will turn on.

Figure 24. Unzipping Balloon

2.Push the button above the LED with a blunt object for three seconds as shown in Figure 25. LED will turn red and the lamp will turn off. The balloon will remain inflated.

PUSH WITH

BLUNT OBJECT

LED

Figure 25. Turning Off Lamp Only

page 20 — GBC/GBCE lighting system • operation and parts manual — rev. #1 (03/25/14)

Page 20
Image 20
Multiquip gbe/gbce manual Lowering The Mast, Shutdown, shutting down lamp only, Applying Power, operation