Multiquip JB5090 Jimmy Series Hydraulic Rebar Benders - Operation, Rebar Placement, 90 Rebar Bend

Models: JB7090 JB9180 JB5135 JB8090 JB7135 JB11090 JB5090 JPU1

1 46
Download 46 pages 60.74 Kb
Page 17
Image 17
JIMMY SERIES HYDRAULIC REBAR BENDERS — OPERATION

JIMMY SERIES HYDRAULIC REBAR BENDERS — OPERATION

Figure 12. Rebar Placement

4.Place the pump control valve lever in the forward position (Figure 9).

5.Place and hold the toggle switch on the remote control unit in the ONposition.Therebarbendingprocessshould begin.

6.When the desired rebar bend angle (Figure 13) has been achieved, release the toggle switch on the remote control unit. This will stop the forward motion of the cylinder.

7.To retract the cylinder, place the pump control valve lever in the reverse/retract position. The cylinder will retract with or without the pump running.

8.To remove the rebar bender, place the pump control valve lever in the neutral position and either lift the bender over the end of the rebar or remove the main roller and shaft (Figure 14) and slide the rebar bender off the rebar.

The JB5090, JB7090 and JB8090

bender may require adjustment in

NOTE order to obtain a 90° bend. See Rebar Adjustment Bolt section.

Figure 12. Rebar Placement WARNING

Use ONLY graded rebar. Ungraded rebar may break and cause serious injury!

Figure 13. 90° Rebar Bend

Positioning the Rebar Bender (Method 2)

For Models JB5090, JB7090, JB8090, JB9180, JB11090

1.Place the pump control valve lever (Figure 8) in the neutral position.

2.Remove the Main Roller Shaft as shown in Figure 14. Apply a suitable amount of pressure to the shaft to either insert or remove it. It is held in place by a detent ball plunger

Figure 14. Removing the Main Roller Shaft

3.Next, remove the main roller andplacetherebarbender over the rebar. Use vise-grips to hold the rebar bender base in place.

3a. When bending rebar with models JB5090, JB7090, JB8090 only: exchange the main roller for the straight- ening roller supplied from the factory.

4.Reinsertthemainroller,makingsuretherebarispositioned between the main roller and the upper roller arm.

5.Operate rebar bender as outlined in Method 1, steps 3 thru 8.

JIMMY SERIES HYDRAULIC REBAR BENDERS — OPERATION AND PARTS MANUAL — REV. #9 (01/04/08) — PAGE 17

Page 17
Image 17
Multiquip JB5090, JPU1, JB11090, JB7135 Jimmy Series Hydraulic Rebar Benders - Operation, Rebar Placement, 90 Rebar Bend