!WARNING

The server weighs approximately 926.0 pounds (420.0Kg). If the server contains optional equipment, it will weigh more. To avoid personal injury, make sure you have another person help you unpack the server and two other persons help you move the server.

!CAUTION

Exerting excessive pressure on the server cabinet doors may damage them. When performing the next step, be sure to grasp the corner frame of the server when pushing the server towards the unloading ramp.

14.Position a person at the front of the server (rear of pallet) and one person standing on the ramp at the rear of the server. Grasp the corners of the server. Do not put pressure on the center of the front or rear cabinet doors. See Figure 8.

Figure 8. Rolling the Server Down the Ramp

15.With another person pushing on the front corners of the server, the person standing on the ramp should stabilize the movement of the server and guide the server down the center of the unloading ramp. Guide strips are positioned along the sides of the ramp to prevent the server from falling off the sides of the ramp. See Figure 8. Remove the server from the shipping pallet.

16.Once the server is removed from the pallet, remove any bubble-pack and the shroud that covers and protects the server.

17.With the assistance of another person, move the server to the selected location in the computer room.