NEC N8406-022 manual Connection with CPU Blade

Models: N8406-022

1 62
Download 62 pages 46.6 Kb
Page 50
Image 50
Connection with CPU Blade

(English)

Connection with CPU Blade

The following figure shows the network connection diagram between CPU Blades and Switch Modules. Port 3 and 4 of Mezzanine slot 2 are available only when Type II Mezzanine Card installed.

 

 

Port4

 

Mezzanine

Port3

 

 

 

slot 2

Port2

 

(Type-1,2)

 

 

CPU Blade

 

Port1

 

 

(Express5800/120Bb-6)

Mezzanine

Port2

 

 

slot1

 

 

(Type-1)

Port1

 

on-board LAN

Port2

 

Port1

 

 

To Switch Module slot 6 in Blade Enclosure(6U) To Switch Module slot 8 in Blade Enclosure(10U) To Switch Module slot 5 in Blade Enclosure(6U) To Switch Module slot 7 in Blade Enclosure(10U)

CPU BladeManual background To Switch Module slot 6 Manual backgroundManual background To Switch Module slot 5

Manual backgroundManual background To Switch Module slot 4

Manual backgroundManual background To Switch Module slot 3

Manual backgroundManual background To Switch Module slot 2

Manual backgroundManual background To Switch Module slot 1

Switch Module slot number in Blade Enclosure

Switch Module slot 5

Switch Module slot 6

Switch Module slot 3

Switch Module slot 4

Switch Module slot 1

Switch Module slot 2

 

 

Switch Module slot 1 Switch Module slot 3 Switch Module slot 5 Switch Module slot 7

Switch Module slot 2 Switch Module slot 4 Switch Module slot 6 Switch Module slot 8

Blade Enclosure (6U)

Blade Enclosure (10U)

 

Rear View

NOTE: Switch Module slots 7 and 8 of Blade Enclosure (10U) are available only when Type II Mezzanine Card is installed in CPU Blade.

28

Page 50
Image 50
NEC N8406-022 manual Connection with CPU Blade