NEC N8406-022 manual Removal Procedure, Pull the ejector a little

Models: N8406-022

1 62
Download 62 pages 46.6 Kb
Page 54
Image 54
Removal Procedure

(English)

IMPORTANT:

The Switch Module works with the Blade Enclosure. The Switch Module is powered on as soon as it is installed in the powered Blade Enclosure. Therefore, make sure that the ports connected with the Switch Module are only the ports of on-board LAN and NIC on the CPU Blade. Then, install the Switch Module in the Blade Enclosure.

Do not hold the ejector to install the Switch Module in the Blade Enclosure. Hold the Switch Module itself and insert it into the Switch Module slot. Inserting the Switch Module with the ejector being held, the ejector may be damaged or disengaged from the Switch Module. It may cause the personal injury if the Switch Module drops.

NOTE:

The Switch Module does not have a POWER switch.

The STATUS LED goes on green after the period of about 10 seconds from installing the Switch Module in the powered Blade Enclosure.

Removal Procedure

Refer to the Blade Enclosure User’s Guide for details.

1

Open the ejector of 1Gb Intelligent L2

 

Switch to unlock.

Blade Enclosure

2

Pull the ejector a little.

Ejector

32

Page 54
Image 54
NEC N8406-022 manual Removal Procedure, Pull the ejector a little