GS716T/GS724T Hardware Installation Guide

5.Tighten the screws with a #2 Phillips screwdriver to secure the switch in the rack.

Figure 4-1

Step 3: Checking the Installation

Before applying power perform the following:

Inspect the equipment thoroughly.

Verify that all cables are installed correctly.

Check cable routing to make sure cables are not damaged or creating a safety hazard.

Ensure all equipment is mounted properly and securely.

Installation

4-15

v1.0, January 2011

Page 20
Image 20
NETGEAR GS724T-300NAS manual Checking the Installation