![](/images/new-backgrounds/1193408/19340839x1.webp)
GS748T Gigabit Smart Switch
Step 1: Prepare the Site
Before you install the switch, ensure the operating environment meets the site requirements in the following table.
Characteristics Requirements
Mounting | • Desktop installations - Provide a flat table or shelf surface. |
| • Rackmount installations - Use a |
| rack that is grounded and physically secure. The rackmount kit supplied with the |
| switch is also required. |
|
|
Access | Locate the switch in a position that allows access to the |
| |
|
|
Power source | Provide a power connection cord. Power specifications for the switch are shown in |
| Appendix A. Ensure the AC outlet is not controlled by a wall switch, which can |
| accidentally turn off power to the outlet and the switch. |
|
|
Environmental | • Temperature - Install the switch in a dry area, with ambient temperature between 0 |
| and 50ºC (32ºF and 122ºF). Keep the switch away from heat sources such as direct |
| sunlight, warm air exhausts, |
| • Operating humidity - The installation location should have a maximum relative |
| humidity of 90%, |
| • Ventilation - Do not restrict airflow by covering or obstructing air inlets on the sides |
| of the switch. Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. |
| Be sure there is adequate airflow in the room or wiring closet where the switch is |
| installed. |
| • Operating conditions - Keep the switch at least 6 ft. (1.83 meters) away from |
| nearest source of electromagnetic noise, such as a photocopy machine. |
20