Managed Layer 2 Switches GSM7224 and GSM7248 Hardware Installation Guide
Table 2-1. Site Requirements for Switch Location (continued)
Requirements
Ventilation | Do not restrict airflow by covering or obstructing air inlets on the sides of the switch. |
| Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. Be sure that |
| there is adequate airflow in the room or wiring closet where you will install the switch. |
|
|
Cabling | Route the cable to avoid sources of electrical noise such as radio transmitters, |
| broadcast amplifiers, power lines, and fluorescent lighting fixtures. |
|
|
Installing the Switch
You can install the switch on a flat surface or in a standard
Installing the Switch on a Flat Surface
The switch ships with four
Installing the Switch in a Rack
To install the switch in a rack, you need the
1.Attach the supplied mounting brackets to the side of the switch.
2.Use the provided Phillips head screws to fasten the brackets to the sides of the switch.
Mounting bracket
Figure
Hardware Installation |