Managed Layer 2 Switches GSM7224 and GSM7248 Hardware Installation Guide

Table 2-1. Site Requirements for Switch Location (continued)

Requirements

Ventilation

Do not restrict airflow by covering or obstructing air inlets on the sides of the switch.

 

Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. Be sure that

 

there is adequate airflow in the room or wiring closet where you will install the switch.

 

 

Cabling

Route the cable to avoid sources of electrical noise such as radio transmitters,

 

broadcast amplifiers, power lines, and fluorescent lighting fixtures.

 

 

Installing the Switch

You can install the switch on a flat surface or in a standard 19-inch rack.

Installing the Switch on a Flat Surface

The switch ships with four self-adhesive rubber footpads. Stick one rubber footpad on each of the four concave spaces on the bottom of the switch. The rubber footpads cushion the switch against shock and vibrations.

Installing the Switch in a Rack

To install the switch in a rack, you need the 19-inch rack-mounting kit supplied with your switch.

1.Attach the supplied mounting brackets to the side of the switch.

2.Use the provided Phillips head screws to fasten the brackets to the sides of the switch.

Mounting bracket

Figure 2-1

2-4

Hardware Installation

v1.0, July 2009

Page 20
Image 20
NETGEAR GSM7248, GSM7224 manual Installing the Switch