New Buck Corporation 81 Installation, Operation, And, Maintenance Instructions Model

Models: 81

1 39
Download 39 pages 49.04 Kb
Page 5
Image 5
INSTALLATION, OPERATION, AND

INSTALLATION, OPERATION, AND

MAINTENANCE INSTRUCTIONS

MODEL 81

READ THIS FIRST

IMPORTANT INSTRUCTIONS

The New Buck Corporation non-catalytic system has been tested by Intertek Testing Services, Warnock Hersey to ANSI/UL Standards 1482.

Install and operate your units according to instructions provided in this manual. Local building codes may apply; therefore, contact your local building inspector or fire marshal for necessary installation requirements and permits which may go beyond these instruc- tions.

If appliance is installed in mobile homes: “DO NOT INSTALL IN SLEEPING ROOMS.”

Examine the masonry fireplace and chimney prior to installation of the fireplace accessory to determine that the construction meets the minimum fireplace construction requirements illustrated in the instructions, that it is free from cracks, loose mortar, creosote deposits and other blockage, or other signs of deterioration.

A factory-built pre-fabricated chimney may be used for your units when installed in compliance with the manufacturer's specification and uniform building code.

3

Page 5
Image 5
New Buck Corporation 81 Installation, Operation, And, Maintenance Instructions Model, Read This First