Nortec RESDELUX Figure #7, Steam Plumbing Arrangement Below Humidifier, CONDENSATE HOSE supplied

Models: RESDELUX

1 22
Download 22 pages 58.9 Kb
Page 6
Image 6
Figure #7

Figure #7

Steam Plumbing Arrangement Below Humidifier

min. 2º

min. 10º

 

3.

Avoid condensate traps in the hose, see Figure

 

#8.

4.

Use wall clips (p/n 158-5001) to support the

 

steam and condensate hoses and maintain 1”

 

clearance from the wall. The connection can also

 

be made with ¾” copper pipe with 1” thermal

 

 

12”min.(300mm)

 

(150

mm)

min

 

 

 

6”

 

 

min. 10º

 

 

mm)

mm)

 

(300

(300

12”

 

 

12”

 

 

Nortec Humidifiers

All Models

insulation rated for 215￿F (101°C).

CONDENSATE HOSE (supplied)

Under normal circumstances, when the steam distribution nozzle is above the top surface of the humidifier, the condensate hose is routed back to the top of the humidifier and fed through the opening provided to the fill cup. Cut the ends diagonally and simply insert ½" in the appropriate hole in the top of

To be 2” (50mm) longer

 

 

then duct static pressure

min. 2º

min. 10º

or minimum.

the humidifier. Install a 3/8” copper tubing trap at the lowest point in the condensate system. Connect to the

min. 20 %

 

 

 

 

 

 

 

 

 

 

mm)

 

 

 

 

 

 

 

min. 20 %

(300min.12”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(150

mm)

min

 

 

 

 

 

 

 

 

 

 

6”

 

 

 

 

 

 

mm)

mm)

(300

(300

.

 

12”

 

12”

Rmin

 

 

Nortec Humidifiers

 

 

All Models

 

(150

mm)

min

 

 

 

6”

 

 

hose with a clamp Figure #6.

BLOWER PACK CONNECTION

The RESDELUX humidifier can be purchased with an optional blower pack for direct room humidification. The blower pack is field installed on the RESDELUX humidifier cabinet or located remote from the RESDELUX humidifier.

The blower pack is powered directly from the RESDELUX control board. It cannot be powered separately.

STEAM HOSE INSTALLATION

1.The length of the steam hose must not exceed 4’ (1.2m).

2.It must not be restricted in any way (i.e. - a kink resulting from a short radius bend).

Figure #8

Steam Hose Routing

Avoid Water Traps

Avoid kinks

Proper

Slope

Gentle

Sweeping

Turns

On a call for humidity, blower fans are powered and remain powered for about two minutes after steam production is interrupted.

Cabinet Mounting of the Blower Pack

The RESDELUX blower pack comes with a basic hardware kit. The kit contains all the hardware required to cabinet mount the blower pack.

NOTE: Mounting of the blower pack must be performed before the RESDELUX humidifier is installed and wired.

1.Remove the RESDELUX humidifier and blower pack from their shipping boxes.

2.Place the RESDELUX humidifier upright on a flat surface.

3.Remove the 7/8” knockout on the top of the RESDELUX humidifier. There are two knockouts, select the one closest to the large opening.

- 3 -

Page 6
Image 6
Nortec RESDELUX Figure #7, Steam Plumbing Arrangement Below Humidifier, CONDENSATE HOSE supplied, Blower Pack Connection