Oneida Air Systems 2000 manual System Start-Up Information

Models: 2000

1 21
Download 21 pages 41.08 Kb
Page 3
Image 3

I. System Start-Up Information

1.Read the installation and maintenance instructions as well as the recommended safety practices in this manual.

2.Install Ductwork completely before operating collector:

A.) Seal ductwork with silicone sealant or duct tape.

B.) Have Dust Bin in place and sealed.

3.Have licensed electrician wire Fan / Blower according to wire diagram on pg. 13 in this owner’s manual.

4.Have licensed electrician check current draw on motor with all gates open. Current draw should not exceed maximum motor amperage. (OAS is not responsible for damage to motors caused by improper installation, wiring or failure to follow these directions.)

Caution

The Direct Drive Fan / Blower makes the system top heavy!

Use extreme care when setting the unit up!

Warning

Do not operate Fan / Blower unless Cyclone and Dust Bin

are in place. Motor will over heat!

Warning

Check amperage draw during operation with all blast gates open. Make certain amperage is not outside operating limit indicated on motor plate!

Warning

If amperage is too high - shut down immediately!

(See troubleshooting section.)

2

Pro 2000 Owner’s Manual c O.A.S. 2007

Page 3
Image 3
Oneida Air Systems 2000 manual System Start-Up Information