2. Preparation for operation

2. Preparation for operation

Start up all outdoor sensors first, then the base station.

2.1. The outdoor sensors

The following outdoor sensors are available for the weather station:

-E 9301 combi-sensor: This is a permanently addressed combination sensor consisting of rain sensor, instant rain detection sensor, wind speed sensor, outdoor temperature/humidity sensor and integrated transmitter unit. Operation is by means of three AA batteries.

-E 9305 outdoor temperature/humidity sensor: Addressable sensor, battery- operated (2 AA batteries). Up to 8 sensors of this type can be used for operation on the E 9300.

Commissioning

E 9301

The E 9301 is commissioned according to the following procedure:

-Assemble the pipes of the sensor mast via the pipe-connectors. The pipe, which is squeezed on one side, is used as earth spike. Connect the twin-connector with the E 9301 to the top of the mast.

-Open the housing of the sensor by turning the housing counter-clockwise and pulling from underneath (see picture bottom left).

-Insert three AA batteries into the battery compartment as indicated by the pole markings in the compartment.

To detach: Turn to the left, remove from underneath

To attach:

Attach,

turn to the right

– + –

+ – +

Bottom