Operating Modes

Automatic Regulation Setup

Setup for Automatic Voltage Regulation parameters.

Outlet Bank 2 Setup

Adjusts the battery charge threshold in which Outlet Bank 2 is shut off to conserve power for the critical loads connected to Outlet Bank 1.

If set to OFF, Outlet Bank 2 will shut off immediately when the unit goes into UPS Mode.

IR1 Control Setup

IR1 Control Setup is a two-step process in which the IR remote control signal is sampled, and tested by outputting the learned signal on the output jack.

IR Output Delay

IR Output Delay is the time delay before outputting the IR signals on the IR output jacks after the unit goes into UPS mode.

IR Output Delay time starts at 0 sec, incremented in 5 sec inter- vals, with a maximum value of 60 sec.

Setup Buzzer Mode

Change the UPS BUZZER MODE to set it to on or off.

UPS Test Mode

UPS Test Mode places the unit in UPS Mode temporarily to verify that the UPS inverter can adequately supply the connected load.

System Info

Displays the brand, model number and firmware revision

Advanced Operation

A connection to a UPS can benefit projector bulbs, server based products, and units with volatile electronic memories found in but not limited to Pro Audio, Broadcast and High-End Home Theater equipment. The MB1000 takes this to the next level with a number of features designed specifically for AC Power back up applications.

Critical Load Function

One of the user programmable settings in the MB1000 software is the Low Battery Non-Critical Load (NCL) Shutoff threshold. This sets the battery capacity level at the point where the NCL outlets are turned off and all remaining battery power is reserved for equipment plugged into the 4 critical load outlets. This value is stored internally by the UPS and is not dependent on having the software running on a computer.

Patent-pending Learning IR Control

The learning IR function lets you program the UPS to send standby or shut-down commands to components such as DLP ceiling projectors. If the power fails, the projector’s lamps are turned off while the UPS continues providing battery power to the projector’s cooling fan. Proper shutdown is ensured and expensive lamps are protected from damage.

Note: This function should only be used with discrete IR codes. Programming an On/Off toggle command could result in the equipment being turned ON during a power failure!

IR Power Failure Operation

The UPS can learn two IR commands. The learned commands will be transmitted on both output jacks so you have the ability to control 2 different pieces of equipment or use a 2-step macro for one component.

1.After a power failure and the selected delay, the IR codes will be sent to both outputs. The IR LED’s will flash once per second during the delay time and will stop flashing after the IR code is sent.

6

Page 8
Image 8
Panamax MB1000 manual Advanced Operation

MB1000 specifications

The Panamax MB1000 is a prominent addition to the maritime industry, recognized for its advanced features and capabilities that cater specifically to the transportation and cargo handling sectors. Designed with a focus on efficiency and performance, this vessel has become a preferred choice among shipping companies looking to optimize their operations.

One of the main characteristics of the MB1000 is its impressive cargo capacity. With a deadweight tonnage exceeding 60,000 tons, the vessel is engineered to carry a significant amount of cargo, making it an ideal solution for bulk carriers. This capacity is coupled with a well-designed hull that ensures stability and speed, allowing for quick turnarounds and efficient voyages.

The MB1000 is equipped with state-of-the-art propulsion technology. It features a powerful diesel engine that delivers high output while maintaining fuel efficiency. The combination of low fuel consumption and reduced emissions aligns with global environmental standards, making the MB1000 a more eco-friendly choice in the industry.

In terms of navigation and safety, the vessel is outfitted with advanced electronic systems. The integrated bridge system includes radar, GPS, and autopilot functions that enhance situational awareness for the crew, ensuring safer and more precise navigation across various maritime conditions. Furthermore, the vessel adheres to the latest safety regulations, equipped with life-saving equipment and fire-fighting systems to ensure the utmost safety for the crew and cargo.

The design of the MB1000 also emphasizes crew comfort and operational efficiency. The ship features spacious accommodations, including well-appointed cabins and common areas designed to provide a restful environment during long voyages. The operational areas are meticulously arranged to facilitate smooth workflows for the crew, improving overall productivity.

Additionally, the Panamax MB1000 is built for adaptability, enabling shipping companies to adjust the interior layouts and equipment based on specific cargo requirements. This flexibility, combined with cutting-edge engineering and innovative technologies, solidifies the MB1000’s reputation as a modern workhorse in the maritime sector.

Overall, the Panamax MB1000 stands out as a sophisticated vessel that encapsulates the evolution of maritime technology, combining performance, safety, and environmental consciousness, making it a valuable asset for any shipping fleet.