Index
IN-2 3162-A2-GB20-30
March 1999
configuration options
procedure for changing, 3-12
tables
Alarm, C-24
Cross Connect, C-11
DTE Interface, C-4
General, C-15
Management and Communication, C-26
Network Interface, C-2
Port, C-6
User Interface, C-17
worksheets, C-34
connectors, rear panel
cabling examples, 2-5
functional description, 1-4
physical description, 1-3
pin assignments, D-1– D-14
CPU failure message, 4-2
crossover cable, D-13
CSS (Controlled Slip Seconds) report, 4-6
Customer 1 configuration area, 3-12
Customer 2 configuration area, 3-12
Ddaisy chaining
configuration options, C-17, C-23
connectivity, 1-4, 2-3, 2-4
data channel loopback (DCLB), 4-20, C-9
data port.
See
PORT (1–2) interface
data terminal loopback (DTLB), 4-21, C-9
database, SNMP, 1-2
Device Fail message, 4-4
dimensions, B-2
Download operation, 3-34
DS0 channel allocation.
See
channel allocation
DTE Drop/Insert interface
channel allocation procedure, 3-20
configuration options, C-4
failure message, 4-2
front panel LED indications, 3-3
functional description, 1-2, 1-4, 2-1
managed by SNMP, E-1
physical description, 1-3
pin assignments, D-3
technical specifications, B-1
troubleshooting, 4-11
DTE loopback (DLB), 4-18
configuration option, C-5
external control interface, D-3
EEER (Excessive Error Rate) condition
ASCII terminal/printer message, 4-8
Device Health and Status message, 4-3
front panel LED indication, 3-2, 3-3
Performance Report message, 4-7
troubleshooting, 4-12
EIA-530-A interface, D-7
Embedded Data Link (EDL)
configuration option, C-7
used with SNMP system, 1-2, 2-3, 2-4, F-1
enterprise-specific trap, 4-9
environmental specifications, B-2
equalization, line, C-4
error messages.
See
messages, alarm
ES (Errored Seconds) report, 4-5
external modem interface, D-13
FFacility Data Link (FDL)
configuration option, C-3
used with SNMP system, 1-2, 2-3, 2-4, F-1
Factory 1 configuration area, 3-12
Factory 2 configuration area, 3-12
failure analysis.
See
troubleshooting
failure message, troubleshooting, 4-12
features, 1-1– 1-4
fractional T1, 2-1, 2-2
framing configuration option, C-2, C-4
front panel
operation, 3-1
physical description, 1-3, 3-1
Iindicators.
See
LEDs, front panel
IP (Internet Protocol) addressing
configuration option, C-26, C-27, C-28
example of use, F-1
procedure for configuring, 3-18