Patterson-Kelley TBIG-03 owner manual 4.0INSTALLATION

Models: TBIG-03

1 24
Download 24 pages 29.92 Kb
Page 7
Image 7
4.0INSTALLATION

motorized gas valve (natural gas)

regulator*

pilot shutoff

natural gas connection manual shutoff

low gas

pressure switch*

propane connection manual

pilot regulator and solenoid valve

leak test valves

Installation

mechanical link to control air (Lo-Hi-Lo only)

burner

pressure tap

secondary shutoff, manual

high gas pressure switch*

motorized gas valve

shutoff

regulator *

low gas

pressure switch*

n.o. vent valve

 

 

(I.R.I. only)

Items with symbol must be

motorized gas valve

vented to outside.*

Refer to the

drawings packed with your

(propane)

boiler for additional information.

 

 

 

 

Figure 4-1 Piping Schematic for the Twin-Fuel Gas Train

4.0INSTALLATION

Gas Train Connection Sizes

 

Natural Gas

Propane

 

 

 

700/1000/1200

1 1/4"

1"

Series

 

 

 

 

 

1500/1700/2000

2"

1 1/4"

Series

 

 

 

 

 

4.1GENERAL

Installation of the twin-fuel Gemini™ boiler is similar to that of the single-fuel model. Refer to “Thermific￿ Gas-Fired Boiler - Installation and Owner’s Manual - TBIG” pages 2 through 10.

- 5 -

The following procedures are different from those for the single-fuel model, and are described in this Sec- tion:

￿￿Gas Piping

Gas Bleeds and Vents

￿￿Pre-Start Check List

￿￿Pre-Start Safety Checks and Adjustments Test of Ignition Safety System Test of Low Water Cutoff

Test of High Limit Control Test of Gas Pressure Switch

Page 7
Image 7
Patterson-Kelley TBIG-03 owner manual 4.0INSTALLATION