SmartNode 4960 Getting Started Guide | 3 • SmartNode installation |
|
|
Connect the cables in the following order:
The interconnecting cables shall be acceptable for external use and shall be rated for the proper application with respect to volt- age, current, anticipated temperature, flammability, and
CAUTION mechanical serviceability.
1.Connect the T1/E1 cables to the PRI T1/E1 ports (see Appendix C on page 55 and Appendix D on page 60).
2.Connect the
3.Connect the power mains cable (see section “Connecting the power supply” on page 28)
Connecting the PRI
The SmartNode comes with one or four PRI ports. These ports are usually connected to a PBX or switch (local exchange (LE) ). Each PRI T1/E1 port is a
For details on the PRI port
Connecting the 10/100/1000Base-T Ethernet LAN and WAN cables
The SmartNode 4960 has automatic MDX
1.Connect to the subscriber port of the broadband access modem (DSL, cable, WLL) to ETH 0/0.
Note The SmartNode Ethernet ports operate in Full Duplex mode only. Do not connect to Half Duplex ports. For best results, use
2.Connect port ETH 0/1 to your LAN.
Installing the DSL WAN cable. The SmartNode Model 4960 comes with an option for a G.SHDSL WAN interface. Use a
For details on the Ethernet port pinout and cables, refer to Appendix C, “Cabling” on page 55 and Appendix D, “Port
Installing the gateway router | 27 |