4.Use the 6-32 toggle bolts (not supplied) to attach the surface mount ring and back box to the mounting surface, refer to Figure 2.

NOTE: For a concrete ceiling/wall installation, use 8-32 mounting hardware (not supplied), refer to Figure 3.

Figure 2. Ceiling/Wall Installation

Figure 3. Concrete Ceiling/Wall Installation

C2462M-D (3/08)

9

Page 9
Image 9
Pelco 90 manual Ceiling/Wall Installation