Pella 80WX0101 Opening Preparation, Window Preparation, Note For Double-hung, proceed to Step B

Models: 80WX0101

1 8
Download 8 pages 20.53 Kb
Page 3
Image 3
2 OPENING PREPARATION

2 OPENING PREPARATION

A.Inspect the existing window frame and repair or replace

any defective or rotted wood parts.

B. Clean the opening of any dirt, debris, or excess old paint before proceeding.

C. Apply one piece of sill flashing tape to the sill of the existing window. Cut the tape the same length as the width of the existing window sill. Place one side of the tape against the vertical leg of the stool, and work the tape into the corner before applying to the sill. Press down firmly. The tape will not cover the sill depth completely under the new window.

Note: If needed, blocking/shims may need to be placed where the existing balances were located.

2C

TWO OR MORE PEOPLE ARE REQUIRED FOR THE FOLLOWING STEPS.

3 WINDOW PREPARATION

Note: For Double-hung, proceed to Step B.

A.Casement: On the room side of the window, drill 1/8" diameter clearance holes through the head, jambs and sill of the frame. Space the holes a maximum of 6" from each end and a maximum of 16" on center.

Note: On vent casements, place the holes so they do not interfere with the roto operator and the latch points on the lock side of the window.

Designer Series®

Architect Series®

and ProLine®

Double-Hung

Drill 1/8"

clearance hole

3A

Casement Sill

 

 

 

 

 

 

 

 

 

 

EVERY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6"

 

 

16"

 

 

6"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6"

 

 

 

 

 

 

 

 

 

 

 

 

6"

 

 

 

Single

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EVERY

 

 

 

EVERY

16"

 

 

 

 

 

Window

 

16"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6"

 

 

 

 

 

 

 

 

 

 

 

 

6"

 

Double-Hung Head

A.Inspect the existing window frame and repair or replace 1/2"

Drill 1/8"

clearance hole

3D

Double-Hung Jamb

3B

 

1/4"

 

Drill 1/8"

clearance hole

3B3D

 

Drill 1/8"

clearance hole

TWO OR MORE PEOPLE ARE REQUIRED FOR THE FOLLOWING STEPS. 1/2"

Double-Hung Sill

 

Double-Hung Head

 

Drill 1/8"

 

clearance hole

D

 

3B

Double-Hung Jamb

Drill 1/8"

clearance hole

3BD

Drill 1/8"

clearance hole

Double-Hung Sill

Clad Frame Head

3 WINDOW PREPARATION 1"

Drill 1/8"

clearance hole

3D

3B

Drill 1/8"

clearance hole

1"

Clad Frame Sill

B.Double-Hung and Clad Frame: On the room side of the window, drill 1/8" diameter clearance holes through the frame at the locations shown. Space the holes a maximum of 6" from each end and a maximum of 16" on center.

Note: The lower sash must be raised to drill the holes in the sill of the double-hung window.

Page 3
Image 3
Pella 80WX0101 warranty Opening Preparation, Window Preparation, Note For Double-hung, proceed to Step B