2 OPENING PREPARATION

A. Inspect the existing window frame and repair or replace any defective or rotted wood parts.

B. Clean the opening of any dirt, debris, or excess old paint before proceeding.

C. Apply one piece of flashing tape to the sill of the existing window. Cut the tape the same length as the width of the existing window sill. Place one side of the tape against the vertical leg of the stool, and work the tape into the corner before applying to the sill. Press down firmly. The tape will not cover the sill depth completely under the new window.

Note: If needed, blocking/shims may need to be placed where the existing balances were located.

TWO OR MORE PEOPLE ARE REQUIRED FOR THE FOLLOWING STEPS.

$

3 WINDOW PREPARATION (AWNING and CASEMENT ONLY)

" /*/(

$"4&.&/5

The interior frame covers must be removed to provide access to the pre-drilled frame screw installation holes.

CAUTION: To Avoid Interior Frame Cover Breakage - Carefully read and understand the

following steps before proceeding with cover removal.

Note: The following interior frame cover removal steps are for Casement, Standard Awning, Fixed Awning/Casement and Large Awning. The steps are similar for each, but the order in which covers are removed will vary depending on the window type.

7KHRUGHURILQWHULRUIUDPHFRYHUUHPRYDOLVLQGLFDWHGEHORZ8VHUHYHUVHRUGHUIRUUH installation of covers.

$"4&.&/5

$07&3

$07&3

$07&3

45"/%"3%"

/*/(

$07&3

$07&3

 

$07&3

 

-"3(&" /*/(

$07&3

$07&3

$07&3

'*9&%" $.

$07&3

$07&3

$07&3

Page 3
Image 3
Pella 80YW0102 warranty Opening Preparation, Window Preparation Awning and Casement only