
Installation and commissioning
8.06 Mount and connect approach barrier
2
5
4
3
6 | 1 |
Fig. 8 - 09
●For machines delivered without table, plate 1 (included in the accessories) must be mounted underneath the table top in such a way that the switching plate 2 is flush with plate 1 when the sewing head is tilted upright.
●Loosen screws 3 and align carrier 4 in such a way that switching plate 2 is free when the sewing head is on its side, and pressed, when the sewing head is upright.
●Connect connectors of the approach barrier on contacts 5 (red/blue) and 6 (grey/pink).
8.07 Checking the start inhibitor function
● Switch the machine on at the main switch and tilt back the sewing head.
● The error message "Er 0 16" (on
● If the message does not appear, check the setting of safety switch 2.
● After the sewing head has been returned to the upright position, the machine is ready for operation again.
24