Pioneer PRV-LX1 manual 8.0Product-SpecificNotes, 8.1Recording Delay

Models: PRV-LX1

1 20
Download 20 pages 54.1 Kb
Page 17
Image 17
8.0Product-Specific Notes

PRV-LX1 RS-422A Protocol

8.0Product-Specific Notes

8.1Recording Delay

There is a short delay of approximately 29+/-2 frames between when the PRV-LX1 is issued a record command and the command is executed.

This delay is a result of the following:

Requires 12 frames for encoding system setup

Execution of the command may take +2 frames

Execution of the command may take–2 frames

Record default offset for the LX1 is 17 frames

The above delay shows the calculation of a maximum +29 frames +/- 2 frames delay.

Pioneer Electronics suggest that PRV-LX1 users pad these frame times to the head/tail of the selected I/O points to ensure that an entire video sequence is recorded.

Page 16 of 18

Page 17
Image 17
Pioneer PRV-LX1 manual 8.0Product-SpecificNotes, 8.1Recording Delay