Plantronics R-410A Checking And Testing Operations, 9 000-12000 BTU, 15 000-18 000-24000 BTU

Models: R-410A

1 26
Download 26 pages 59.58 Kb
Page 18
Image 18
CHECKING AND TESTING OPERATIONS

CHECKING AND TESTING OPERATIONS

Perform the operation test after completing the gas leak check of the flare nut connections and the electrical connections.

1.To begin the test, turn on the power.

2.Press the auxiliary control button in the indoor unit or use the remote control to start the unit.

3.Check that all air conditioner functions are operating normally. A protection feature prevents the air conditioner from being started immediately after the unit has been turned off. There is a delay of 3 minutes for the air conditioner to restart and operate.

4.Press the auxiliary control button to end the operation test.

9 000-12 000 BTU

 

15 000-18 000-24 000 BTU

 

 

 

 

 

 

 

 

 

 

 

 

Auxiliary control button

Auxiliary control button

 

Installation & service manual _15

Page 18
Image 18
Plantronics R-410A manual Checking And Testing Operations, 9 000-12000 BTU, 15 000-18 000-24000 BTU