2
Installing the Spectralink 8000 SVP Server As shown in the system diagram the SVP Server is connected to the
Ethernet switch. The specifications covered here allow for great
flexibility in physical placement of the components within stated
guidelines.
Required Materials
The following equipment must be provided by the customer.
Power Outlet – AC adapter provided by Polycom
Backboard space – The SVP Server is designed to be wall-
mounted to 3/4" plywood securely screwed to the wall.
Screws – Required to mount the SVP Server to the wall. Four #8
3/4" panhead wood screws (or similar device) are required.
Cat. 5 Cable – RJ-45 connector at the SVP Server. Connection to
Ethernet switch.
Locate the SVP Server
The SVP Server measures approximately 4 x 12.5 x 7 inches, and
weighs about five pounds. The unit can be wall mounted, vertically or
horizontally, over ¾" plywood. The SVP Server can also be rack
mounted using a rack mount kit (sold separately).
Locate the SVP Server in a space with:
• Sufficient backboard mounting space (for wall mount) and
proximity to the LAN access device (switched Ethernet hub) and
power source.
• Easy access to the front panel, which is used for cabling.
PN: 1725-36032-001_F.doc 15